LTS was engaged by L & M Powerlines, to drill numerous size diameter holes in Very High to Extremely High strength rock, for the construction of a power line for a 12km alignment for a new coal conveyor running from Peak Downs washery to Cavil Ridge washery.
Construction of line included LTS to work closely with BHP coal operations and various sub contractors working on the same project, in both Caval Ridge, and Peak Downs Mine.
The project required LTS staff and equipment to comply with all BHP requirements, making LTS BHP Compliant Australia wide.